W.W. Grainger's corporate campus includes an underground reservoir and pumping station to bring potable water to the 155-acre site while eliminating the need for an on-site water tower.
Category
Reservoir and Pumping Station
Snapshot
600,000 gallon reservoir with potable water
Two 1500 gpm pumps plus two 100 gpm pumps with chlorination system
Services Provided
Site Investigation
Site Survey
Site Plan
Preliminary and Final Design
Stormwater Management Design
Construction Assistance
Wetlands Management
Site Considerations
The site plan specified maximum building height for the development, and included a natural screen to shield structures from surrounding residential areas. An underground reservoir eliminated the need for a water tower, which would have exceeded the maximum building height.
Underground facilities helped preserve the natural ambience of the site, which includes a natural creek, forest preserves, a wetland and a 1.5-mile nature trail.