Expanded from four lanes to nine to accommodate heavy retail traffic, this major artery remained operational during a year-long widening project.
Category
Municipal Roadway
Snapshot
Over one-half mile
Nine lanes
Intersection with seven-lane cross street
Services Provided
Stormwater Management Design
Site Design
Permitting and Approval
Intersection Design Study (IDS)
Site Considerations
Over one-half mile in length, the entire artery needed to remain open during all phases of construction.
Site design included street lights, traffic signals, restriping and turn lanes, all part of a heavily traveled suburban corridor.
The timeline was tight, driven by the pre-scheduled opening of a nearby regional mall, which would increase flow in a corridor that was already heavily congested with retail traffic.
The corridor crosses multiple jurisdictions, requiring a lengthy permitting and review process with State highway and county agencies.